- Location Canada
- Energy Hydroelectricity
- Client BC Hydro
- Status In operation
- Commissioned 1996
- Acquired 2012
- PPA expiry 2043
- Gross installed capacity 7.2
- Participation Innergex (%) 100
Brown Lake is a 7.2 MW run-of-river facility commissioned in 1996 and located on private land and Crown land near Prince Rupert in the North Coast region of British Columbia.