Site

Brown Lake

  • Location Canada
  • Energy Hydroelectricity
  • Client BC Hydro
  • Status In operation
  • Commissioned 1996
  • Acquired 2012
  • PPA expiry 2043
  • Gross installed capacity 7.2
  • Participation Innergex (%) 100
Brown Lake is a 7.2 MW run-of-river facility commissioned in 1996 and located on private land and Crown land near Prince Rupert in the North Coast region of British Columbia.