Dokie

The Dokie wind project is located approximately 40 km west of Chetwynd, British Columbia, and was placed into operation in 2011.

The project consists of 48 – 3.0MW Vestas V90 turbines connected with overhead collection lines to a central switchyard. A 7.0 km-long 230 kV transmission line transmits the electricity from the switchyard to the BC Hydro point of interconnection. All of the power generated by the Dokie project is covered by a 25-year power purchase agreement (PPA) signed with BC Hydro, which started at commercial operation and expires in 2036.

The Dokie Wind project has been granted the ECOLOGO® certification.

Energy Energía eólica
Client BC Hydro
Estado In operation
Commissioned 2011
Acquisition 2018
Capacity - Gross (MW) 144
Innergex participation (%) 25.5
Partner Axium Infrastructure

Partnership

Innergex owns a 25.5% interest in the wind farm and Axium Infrastructure owns the remaining 74.5%.