Dokie
The Dokie wind project is located approximately 40 km west of Chetwynd, British Columbia, and was placed into operation in 2011.
The project consists of 48 – 3.0MW Vestas V90 turbines connected with overhead collection lines to a central switchyard. A 7.0 km-long 230 kV transmission line transmits the electricity from the switchyard to the BC Hydro point of interconnection. All of the power generated by the Dokie project is covered by a 25-year power purchase agreement (PPA) signed with BC Hydro, which started at commercial operation and expires in 2036.
The Dokie Wind project has been granted the ECOLOGO® certification.
Energy |
Energía eólica |
Client | BC Hydro |
Estado | In operation |
Commissioned | 2011 |
Acquisition | 2018 |
Capacity - Gross (MW) | 144 |
Innergex participation (%) | 25.5 |
Partner | Axium Infrastructure |
Partnership
Innergex owns a 25.5% interest in the wind farm and Axium Infrastructure owns the remaining 74.5%.