- Ubicación Canadá
- Energía Energía eólica
- Cliente BC Hydro
- Estado In operation
- Puesta en servicio 2011
- Adquisición 2018
- Vencimiento de PPA 2036
- Potencia bruta instalada 144
- Participación Innergex (%) 25.5
- Asociación Axium Infrastructure
The Dokie wind project is located approximately 40 km west of Chetwynd, British Columbia, and was placed into operation in 2011.
The project consists of 48 – 3.0MW Vestas V90 turbines connected with overhead collection lines to a central switchyard. A 7.0 km-long 230 kV transmission line transmits the electricity from the switchyard to the BC Hydro point of interconnection. All of the power generated by the Dokie project is covered by a 25-year power purchase agreement (PPA) signed with BC Hydro, which started at commercial operation and expires in 2036.
The Dokie Wind project has been granted the ECOLOGO® certification.