  • Status In construction
  • Gross installed capacity 35
  • Participation Innergex (%) 100

The San Andrés battery energy storage project, with a storage capacity of 35 MW/175 MWh (5 hours), will be located on the site of Innergex's existing San Andrés solar park (50.6 MW) in the Atacama Desert, northern Chile.

The San Andrés battery project will feature Mitsubishi Power's Emerald storage solution. It will redistribute the renewable energy generated by the solar park and stored during the day into the evening. Work on the site began in February 2023 and is progressing well, with the necessary permits in place.

Currently under construction, the system is scheduled for commercial operation in 2024.