- Location Chile
- Energy Hydroelectricity
- Client Various
- Status In operation
- Commissioned 2011
- Acquired 2018
- PPA expiry 2027
- Gross installed capacity 12
- Participation Innergex (%) 69.5
Guayacán is a run-of-river hydroelectric power plant with an installed capacity of 12 MW.
This facility is located in the San José of Maipo comune, metropolitan area, and its commercial operation began in 2010.
The plant was built with serious consideration of the environment, in order to take advantage of Rio Maipo’s potential resources for sustainable energy production.